PR 704 over CUYON RIVER

500 MTS WEST OF BR. 1062 · County 043, Puerto Rico · Built 1991 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
022421
Year Built
1991
Length
70.9 m (232.6 ft)
Max Span
23.7 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000
Total Project Cost
$300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.