ESMRLDA AVE 0.6 KM over PR 20 4.1 KM

2 KM N E OF GUAYNABO · County 061, Puerto Rico · Built 1992 · 4 Lanes · 20,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
022281
Year Built
1992
Length
46.7 m (153.2 ft)
Max Span
22.1 m
Width
20.4 m (66.9 ft)
Lanes
4
Daily Traffic
20,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$417,000
Total Project Cost
$500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.