PR 120 TO 357KM.01 over MARICAO RIVER

CONNECTOR PR120 TO PR357 · County 093, Puerto Rico · Built 1983 · 2 Lanes · 4,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
022081
Year Built
1983
Length
18.1 m (59.4 ft)
Max Span
8.3 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
4,200
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$34,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.