PR 14 9.6 KM over INABON RIVER
6 KM WEST OF JUANA DIAZ · County 113, Puerto Rico · Built 1991 · 2 Lanes · 19,700 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
18.052861, -66.551981
This bridge is in worse condition than 61.3% of bridges in County 113. The average bridge in Puerto Rico is 0 years old; this one is 35 years old.
Nearby Bridges
PR 506 1.2 KM over UNNAMED CREEK
Built 1975
OFF PR 506 0.95 KM over UNNAMED CREEK
Built 2011
PR 52 over UNNAMED CREEK
Built 1970
PR 52 NOBD 95.5 KM over PR 506 KM 1.5
Built 1970
PR 52 SOUTHBOUND over PR 506 KM 1.5
Built 1970
LOCAL ROAD OFF 506 over UNNAMED CREEK
Built 2011
PR 52 SOBD 94.3 KM over INABON RIVER
Built 1970
PR 52 NTBD 94.3 KM over INABON RIVER
Built 1970
PR 52 SOUT 94.6 KM over FARM ROAD
Built 1971
PR 52 NOR 94.6 KM over FARM ROAD
Built 1971
Bridge Details
- Structure #
- 022041
- Year Built
- 1991
- Length
- 61.2 m (200.8 ft)
- Max Span
- 29.3 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 19,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,778,000
- Total Project Cost
- $2,223,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.