SABANA SECA AVENUE over LEVITTOWN CHANNEL
IN SABANA SECA · County 137, Puerto Rico · Built 1970 · 4 Lanes · 23,300 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
18.437561, -66.175789
This bridge is in worse condition than 17.9% of bridges in County 137. The average bridge in Puerto Rico is 0 years old; this one is 56 years old.
Nearby Bridges
PR 866 6.2 KM over LEVITTOWN CHANNEL
Built 1972
PR-866 6.2 KM over LEVITTOWN CHANNEL
Built 1972
JOSE DE DIEGO ST. over LEVITTOWN CHANNEL
Built 1960
OFF PR 167 KM 26.9 over UNNAMED CREEK
Built 1986
ESPIRITU SANTO ST. over DRAINAGE CHANNEL
Built 1970
PR 866 over CREEK
Built 1977
ESPIRITU SANTO ST. over RIO HONDO CHANNEL
Built 1970
CONCHA CAMARON ST. over CHANNEL
Built 1973
PR 872 over HONDO RIVER
Built 1977
PR 22 over PR 872
Built 1976
Bridge Details
- Structure #
- 021741
- Year Built
- 1970
- Length
- 8.8 m (28.9 ft)
- Max Span
- 4.3 m
- Width
- 32.6 m (107 ft)
- Lanes
- 4
- Daily Traffic
- 23,300
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $20,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.