LUNA ST 0.01 KM over SAN JOSE LAGOON CHANNEL
BETWEEN L ANGLS & L G · County 031, Puerto Rico · Built 1960 · 2 Lanes · 6,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
18.429072, -66.014044
This bridge is in worse condition than 89.3% of bridges in County 031. The average bridge in Puerto Rico is 0 years old; this one is 66 years old.
Nearby Bridges
HYDRA STREET over CHANNEL
Built 1981
PR 26 8.30 KM over DRAINAGE CHANNEL
Built 1959
AUSTRAL ST 0.03 KM over CHANNEL
Built 1996
LOS ANGELES AVENUE over LAS FLORES STREET
Built 1996
PR 26 9 KM over LOS ANGELES AVENUE
Built 1996
LOS ANGELES AVE. over CHANNEL
Built 1996
ACUARIO ST 0.01 KM over SAN JOSE LAGOON CHANNEL
Built 1955
Salvador Caro Ave over _
Built 2000
PR 17 13.86 KM over SJU Airport
Built 2002
PR 17 KM 11.5 over PR 26 KM 7.7
Built 1994
Bridge Details
- Structure #
- 021511
- Year Built
- 1960
- Length
- 48 m (157.5 ft)
- Max Span
- 12.1 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 6,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,086,000
- Total Project Cost
- $1,357,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.