JLN BENGCH 0.1 KM over SANTO DOMINGO CREEK
URB. SAN MARTIN R.P. · County 127, Puerto Rico · Built 1950 · 2 Lanes · 1,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
18.3951, -66.003997
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 76 years old.
Nearby Bridges
BLVD M LNA 0.02 KM over SAN ANTON CREEK
Built 1997
PR 849 over SANTO DOMINGO CREEK
Built 1960
MODESTA STREET over SABANA LLANA CREEK
Built 1965
PR 8 KM 3.9 over SAN ANTON CREEK
Built 1997
PR 8 4.1 KM over PR 3 6.3 KM
Built 1997
PR 3 6.7 KM over SAN ANTON CREEK
Built 1953
N AGUAYO ST 0.1 KM over SAN ANTON CHANNEL
Built 1966
CAMPO RICO AVENUE over SAN ANTON CHANNEL
Built 1960
259 STREET KM 0.8 over CHANNEL
Built 1950
URUGUAY ST 0.15 KM over BLASINA CREEK
Built 1985
Bridge Details
- Structure #
- 021381
- Year Built
- 1950
- Length
- 11 m (36.1 ft)
- Max Span
- 5.2 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,300
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $283,000
- Total Project Cost
- $354,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.