PR 3 31.9 KM over MAMEYES CREEK
6.2 KM WEST OF LUQUILLO · County 089, Puerto Rico · Built 1978 · 4 Lanes · 36,100 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
18.372367, -65.763269
This bridge is in worse condition than 30% of bridges in County 089. The average bridge in Puerto Rico is 0 years old; this one is 48 years old.
Nearby Bridges
PR 3 32.3 KM over MAMEYES RIVER
Built 1982
PR 191 over CREEK
Built 1976
PR 955 6.2 KM over MAMEYES CREEK
Built 1980
LOCAL ROAD over DEPRESSION
Built 1956
PR 3 30.7 KM over CATTLE PASS
Built 1978
PR 191 6.3 KM over DEPRESSION
Built 1939
PR 3 over DIRT ROAD
Built 1978
OFF PR 3 over UNNAMED CREEK
Built 1995
RURAL LOCAL ROAD over CULEBRA CREEK
Built 2005
PR 3 36.0 KM over ACCESS TO LUQUILLO BEACH
Built 1980
Bridge Details
- Structure #
- 020961
- Year Built
- 1978
- Length
- 8.5 m (27.9 ft)
- Max Span
- 2.8 m
- Width
- 30 m (98.4 ft)
- Lanes
- 4
- Daily Traffic
- 36,100
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $82,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.