PR 510 over IRRIGATION CHANNEL

1 KM INT PR 14 AT KM 15.0 · County 075, Puerto Rico · Built 1973 · 2 Lanes · 8,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
020071
Year Built
1973
Length
12.4 m (40.7 ft)
Max Span
11.2 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
8,800
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$151,000
Total Project Cost
$189,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.