PR 799 over GRANDE DE PATILLAS RIVER

1.3 KM INT PR181 & PR · County 109, Puerto Rico · Built 1988 · 2 Lanes · 700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
019071
Year Built
1988
Length
168.6 m (553.1 ft)
Max Span
29.3 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,964,000
Total Project Cost
$6,206,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.