PR 799 over GRANDE DE PATILLAS RIVER
1.3 KM INT PR181 & PR · County 109, Puerto Rico · Built 1988 · 2 Lanes · 700 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
18.015233, -66.025972
This bridge is in worse condition than 31.3% of bridges in County 109. The average bridge in Puerto Rico is 0 years old; this one is 38 years old.
Nearby Bridges
PR 181 34.1 KM over IRRIGATION CHANNEL
Built 2009
PR-3 over IRRIGATION CHANNEL
Built 2009
PR 3 over GRANDE DE PATILLAS RIVER
Built 2003
PR 184 2.5 KM over IRRIGATION CHANNEL
Built 1939
PR 3R 0.5 KM over IRRIGATION CHANNEL
Built 1986
PR 7759 0.3 KM over LOS BARROS RIVER
Built 1955
OFF PR 184 over GRANDE DE PATILLAS RIVER
Built 1991
PR 753 5.0 KM over NIGUAS RIVER
Built 1997
OFF PR 755 over IRRIGATION CHANNEL
Built 2014
OFF PR 7755 over JACABOA RIVER
Built 1982
Bridge Details
- Structure #
- 019071
- Year Built
- 1988
- Length
- 168.6 m (553.1 ft)
- Max Span
- 29.3 m
- Width
- 15.1 m (49.5 ft)
- Lanes
- 2
- Daily Traffic
- 700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,964,000
- Total Project Cost
- $6,206,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.