PR 60 NORTH BYPASS over LOS SAUCES STREET

1 MILE N E OF HUMACAO · County 069, Puerto Rico · Built 1986 · 4 Lanes · 34,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
018641
Year Built
1986
Length
36.9 m (121.1 ft)
Max Span
36.9 m
Width
24.5 m (80.4 ft)
Lanes
4
Daily Traffic
34,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$154,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.