PR 131 over GUILARTE RIVER

1.2 KM SOUTH INT PR 135 · County 001, Puerto Rico · Built 1983 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
018321
Year Built
1983
Length
24 m (78.7 ft)
Max Span
20.2 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.