PR 22 over PR 865
7.5 KM S E OF TOA BAJA · County 137, Puerto Rico · Built 1981 · 6 Lanes · 128,200 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
18.415844, -66.204942
This bridge is in worse condition than 46.4% of bridges in County 137. The average bridge in Puerto Rico is 0 years old; this one is 45 years old.
Nearby Bridges
CORUJO COLLECTOR over HONDO RIVER
Built 1967
PR 22 over LOCAL ROAD
Built 1981
PR 2 over HONDO RIVER
Built 1942
OFF PR 866 over CREEK
Built 1989
PR 871 over PR 22 KM.15.1
Built 1976
PR 22 15.6 KM over PR 866 3.1 KM
Built 1981
PR 22 over RIO HONDO CHANNEL
Built 1977
PR 866 over CREEK
Built 1977
PR 22 over PR 872
Built 1976
PR 872 over HONDO RIVER
Built 1977
Bridge Details
- Structure #
- 017211
- Year Built
- 1981
- Length
- 26.6 m (87.3 ft)
- Max Span
- 25.3 m
- Width
- 43.1 m (141.4 ft)
- Lanes
- 6
- Daily Traffic
- 128,200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $2,408,000
- Total Project Cost
- $2,890,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.