PR 907 over CANOVANAS RIVER

10.5 KM S E OF CANOVANAS · County 029, Puerto Rico · Built 1976 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
017051
Year Built
1976
Length
20.1 m (65.9 ft)
Max Span
9.2 m
Width
6.3 m (20.7 ft)
Lanes
2
Daily Traffic
1,000
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$38,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.