OFF PR 146 7.6 KM over LIMON RIVER

10.5 KM N E OF UTUADO · County 141, Puerto Rico · Built 1960 · 1 Lanes · 1,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
015291
Year Built
1960
Length
23.6 m (77.4 ft)
Max Span
4.6 m
Width
3.3 m (10.8 ft)
Lanes
1
Daily Traffic
1,300
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$148,000
Total Project Cost
$177,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.