PR 108 6.4 KM over CA%AS RIVER

5 KM N E OF MAYAGUEZ · County 097, Puerto Rico · Built 1975 · 2 Lanes · 2,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
014541
Year Built
1975
Length
45.6 m (149.6 ft)
Max Span
20.8 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
2,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$70,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.