PR 155 over CREEK

2.5 KM SOUTH OF MOROVIS · County 101, Puerto Rico · Built 1949 · 2 Lanes · 6,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
013981
Year Built
1949
Length
7.6 m (24.9 ft)
Max Span
6 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
6,000
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$161,000
Total Project Cost
$177,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.