PR 149 12.4 KM over GRANDE DE MANATI RIVER

1 KM NORTH EAST OF CIALES · County 039, Puerto Rico · Built 1975 · 2 Lanes · 15,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
013741
Year Built
1975
Length
139.8 m (458.7 ft)
Max Span
40.4 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
15,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$646,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.