OFF PR 759 KM 2.45 over MAUNABO RIVER
3 KM WEST OF MAUNABO · County 095, Puerto Rico · Built 1971 · 1 Lanes · 5,800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
18.009536, -65.926514
This bridge is in worse condition than 72.7% of bridges in County 095. The average bridge in Puerto Rico is 0 years old; this one is 55 years old.
Nearby Bridges
PR 759 2.8 KM over DE LOS CHINOS CREEK
Built 1945
OFF PR 759 over MAUNABO RIVER
Built 2000
OFF PR [email protected] over WATERWAY
Built 2000
OFF PR 759 AT K2.4 over TUMBAO CREEK
Built 1960
OFF PR 750 1.1 KM over TALANTE CREEK
Built 1976
PR 3 KM 108.2 over MAUNABO RIVER
Built 1930
OFF PR 759 AT 6.70 over CREEK
Built 1965
PR 901 over ARENAS CREEK
Built 2000
PR 2 159.4 KM over UNNAMED CREEK
Built 2009
PR-53 KM 51.0 over Waterway
Built 2009
Bridge Details
- Structure #
- 013451
- Year Built
- 1971
- Reconstructed
- 1981
- Length
- 45.4 m (149 ft)
- Max Span
- 12.3 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 1
- Daily Traffic
- 5,800
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $602,000
- Total Project Cost
- $753,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.