PR 1 40.4 KM over UNKOWN CREEK

5 KM SOUTH WEST OF CAGUAS · County 025, Puerto Rico · Built 1890 · 2 Lanes · 17,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
013371
Year Built
1890
Reconstructed
1945
Length
11.4 m (37.4 ft)
Max Span
3.8 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
17,100
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$357,000
Total Project Cost
$535,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.