PR 52 SOUTHBOUND over PR 153

5.3 KM N N E SANTA ISABEL · County 133, Puerto Rico · Built 1971 · 2 Lanes · 19,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
011892
Year Built
1971
Reconstructed
1992
Length
50 m (164 ft)
Max Span
25 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
19,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$966,000
Total Project Cost
$1,812,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.