PR 890 0.4 KM over HONDO RIVER
1 KM NORTH OF BAYAMON · County 021, Puerto Rico · Built 1968 · 2 Lanes · 13,900 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
0
Failed
Superstructure
0
Failed
Substructure
0
Failed
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 0 | Failed |
| Superstructure | 0 | Failed |
| Substructure | 0 | Failed |
Location
18.402828, -66.155914
This bridge is in worse condition than 98.7% of bridges in County 021. The average bridge in Puerto Rico is 0 years old; this one is 58 years old.
Nearby Bridges
PR 890 0.4 KM over HONDO RIVER
Built 1968
MANUEL F. ROSSI ST over HONDO RIVER
Built 1975
RAMP PR 29 TO PR 5 over WATERWAY
Built 1996
PR 29 EASTBOUND over HONDO RIVER
Built 1971
PR 29 WESTBOUND over HONDO RIVER
Built 1971
PR 5 over WATERWAY
Built 1996
PR 8858 0.80 KM over HONDO RIVER
Built 1996
PR 29 over PR 5
Built 1996
PR 5 over RAMON RODRIGUEZ AVENUE
Built 2000
BETANCES STREET over HONDO RIVER
Built 1976
Bridge Details
- Structure #
- 011241
- Year Built
- 1968
- Length
- 32.8 m (107.6 ft)
- Max Span
- 12.8 m
- Width
- 12 m (39.4 ft)
- Lanes
- 2
- Daily Traffic
- 13,900
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $768,000
- Total Project Cost
- $1,440,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.