PR 377 0.1 KM over CONSEJO CREEK

2.5 KM N W OF GUAYANILLA · County 059, Puerto Rico · Built 1968 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
011181
Year Built
1968
Length
18.4 m (60.4 ft)
Max Span
5.3 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
500
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$251,000
Total Project Cost
$301,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.