PR 102 36.0 KM over GUANAJIBO RIVER
3 KM S E OF SAN GERMAN · County 125, Puerto Rico · Built 1969 · 2 Lanes · 11,300 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
18.075578, -67.007878
This bridge is in worse condition than 85.1% of bridges in County 125. The average bridge in Puerto Rico is 0 years old; this one is 57 years old.
Nearby Bridges
PR 3362 0.2 KM over PR 2 177.8 KM
Built 2006
PR 2 178.0 KM over CUPEYES RIVER
Built 1964
PR 2 179.5 KM over LOCAL ROAD
Built 1972
PR 3363 over PR 2
Built 1972
PR 329 over PANCHOLO CREEK
Built 1940
RURAL LOCAL ROAD over PR 2
Built 1972
PR 102 PR 329 2 KM over Rio Guanajibo
Built 2005
PR 329 over RAILROAD TRACK
Built 1940
PR 362 over TORUNO CREEK
Built 1950
PR 3362 KM 2.1 over TURUNO CREEK
Built 1965
Bridge Details
- Structure #
- 010961
- Year Built
- 1969
- Length
- 161.8 m (530.8 ft)
- Max Span
- 13.4 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 11,300
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,187,000
- Total Project Cost
- $3,824,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.