PR 52 93.3 KM over PR 574 1.0 KM

1 KM SOUTH OF JUANA DIAZ · County 075, Puerto Rico · Built 1971 · 2 Lanes · 22,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
010802
Year Built
1971
Length
31.2 m (102.4 ft)
Max Span
30 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
22,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$114,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.