PR 181 NBD 42.8 KM over PR 30 7.4 KM

0.5 KM SOUTH OF GURABO · County 063, Puerto Rico · Built 1969 · 2 Lanes · 2,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
010302
Year Built
1969
Length
52.6 m (172.6 ft)
Max Span
15.1 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
2,800
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$156,000
Total Project Cost
$187,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.