PR 181 NBD 42.8 KM over PR 30 7.4 KM
0.5 KM SOUTH OF GURABO · County 063, Puerto Rico · Built 1969 · 2 Lanes · 2,800 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.249167, -65.972167
This bridge is in worse condition than 60% of bridges in County 063. The average bridge in Puerto Rico is 0 years old; this one is 57 years old.
Nearby Bridges
PR 181 SBD 25.3 KM over PR 30 7.4 KM
Built 1969
PR 30 PR181 0.1 KM over PR 30 7.0 KM
Built 1968
PR 9944 SBD .01 KM over PR 30 7.0 KM
Built 1968
PR 30 6.55 KM over UNNAMED CREEK
Built 1969
PR 30 over CREEK
Built 1968
PR-181 over GURABO RIVER
Built 2005
PR 30 8.55 KM over PR 9030 0.1 KM
Built 1968
PR 30 over EL MAMEY CREEK
Built 1969
PR 30 EASTBOUND over PR 932
Built 1968
PR 30 WESTBOUND over PR 932
Built 1968
Bridge Details
- Structure #
- 010302
- Year Built
- 1969
- Length
- 52.6 m (172.6 ft)
- Max Span
- 15.1 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 2,800
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $156,000
- Total Project Cost
- $187,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.