PR 906 over DITCH
7 KM NORTHEAST OF YABUCOA · County 069, Puerto Rico · Built 1964 · 2 Lanes · 1,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
18.068658, -65.816969
This bridge is in worse condition than 57.4% of bridges in County 069. The average bridge in Puerto Rico is 0 years old; this one is 62 years old.
Nearby Bridges
PR 53 SOUTHBOUND over CHANNEL
Built 1995
PR 53 40.0 KM over PR 906 1.8 KM
Built 1997
PR 53 39.6 KM over LOS PINOS ROAD
Built 1995
PR 53 40.2 KM over GUAYANES RIVER
Built 1997
PR 53 NORTHBOUND over CHANNEL
Built 1995
PR 53 NORTHBOUND over CANDELERO RIVE-DIRT ROAD
Built 1995
PR 53 EASTBOUND over CANDELERO RIVE-DIRT ROAD
Built 1995
PR 3 KM 88.6 over CANDELERO RIVER
Built 1926
PR 906 10.6 KM over CANDELERO RIVER
Built 1996
PR 901 4.1 KM over LAJA CREEK
Built 1955
Bridge Details
- Structure #
- 009061
- Year Built
- 1964
- Length
- 10.1 m (33.1 ft)
- Max Span
- 8.9 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,200
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $182,000
- Total Project Cost
- $212,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.