PR 725 4.2 KM over AIBONITO RIVER

2 KM N W OF AIBONITO · County 009, Puerto Rico · Built 1970 · 2 Lanes · 8,900 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
009041
Year Built
1970
Length
24.6 m (80.7 ft)
Max Span
8.7 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
8,900
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$67,000
Total Project Cost
$101,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.