PR 22 EASTBOUND over DE DIEGO AVENUE

NORTH OF PUERTO NUEVO DEV · County 127, Puerto Rico · Built 1975 · 3 Lanes · 96,550 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
008922
Year Built
1975
Length
64.3 m (211 ft)
Max Span
24.5 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
96,550
Material
Concrete Continuous
Design
Tee Beam
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$1,503,000
Total Project Cost
$1,804,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.