PR 378 3.8 KM over GRANDE CREEK

6 KM NORTH OF GUAYANILLA · County 059, Puerto Rico · Built 1959 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
007831
Year Built
1959
Length
12.8 m (42 ft)
Max Span
6.4 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
400
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$25,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.