PR 3 over PR 1
AT INT PR 1 AND PR 3 · County 127, Puerto Rico · Built 1958 · 4 Lanes · 48,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.396667, -66.054444
This bridge is in worse condition than 25.9% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 68 years old.
Nearby Bridges
PR 3 over STREET # 1
Built 1958
PR 1 over PIEDRAS RIVER
Built 1944
ROBLES ST 0.3 KM over URBAN CITY STREET
Built 1978
RAMP PR25 TO PR17 over RAMP FROM PR 17 TO PR 1
Built 1996
11 S.W. STREET over DO%A ANA CREEK
Built 1960
PR 25 over PR 17 (PI¥ERO AVENU
Built 1993
PR 1 (MU¥OZ R over PR 17 (PI¥ERO AVENU
Built 1993
NTRE DME ST 0.1 KM over PIEDRAS RIVER
Built 1965
4 ST URB NVZ .1 KM over BUENA VISTA CREEK
Built 1950
CALVE STREET over UNNAMED CREEK
Built 2013
Bridge Details
- Structure #
- 007461
- Year Built
- 1958
- Length
- 22.8 m (74.8 ft)
- Max Span
- 22.8 m
- Width
- 21.7 m (71.2 ft)
- Lanes
- 4
- Daily Traffic
- 48,600
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,275,000
- Total Project Cost
- $2,731,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.