PR 957 over CANOVANAS RIVER

5 KM SOUTH OF CANOVANAS · County 029, Puerto Rico · Built 1953 · 2 Lanes · 3,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Failed
Deck
0
Failed
Superstructure
0
Failed
Substructure
0
Failed

Bridge Details

Structure #
006531
Year Built
1953
Length
28.9 m (94.8 ft)
Max Span
12.7 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
3,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$415,000
Total Project Cost
$685,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.