PR 983 1.8 KM over PITAHAYA RIVER
3 KM SOUTH OF LUQUILLO · County 089, Puerto Rico · Built 1945 · 2 Lanes · 4,400 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
18.348447, -65.710247
This bridge is in worse condition than 80% of bridges in County 089. The average bridge in Puerto Rico is 0 years old; this one is 81 years old.
Nearby Bridges
PR 983 1.15 KM over PITAHAYA RIVER
Built 1950
PR 940 over PITAHAYA RIVER
Built 1916
PR 3 over PITAHAYA RIVER
Built 1985
PR 3 40.7 KM over PR 940
Built 1985
PR 991 0.09 KM over SABANA RIVER
Built 1950
PR 988 12.2 KM over PITAHAYA CREEK
Built 1939
PR 988 over CHIQUITO RIVER
Built 1940
PR 3 38.5 KM over SABANA RIVER
Built 1985
PR 984 1.0 KM over JUAN MARTIN RIVER
Built 1950
PR 984 0.6 KM over WATERWAY
Built 1982
Bridge Details
- Structure #
- 005771
- Year Built
- 1945
- Reconstructed
- 2000
- Length
- 17.2 m (56.4 ft)
- Max Span
- 7.7 m
- Width
- 7 m (23 ft)
- Lanes
- 2
- Daily Traffic
- 4,400
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $325,000
- Total Project Cost
- $390,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.