PR 402 over HONDO RIVER
0.1 KM NORTH OF A¥AS · County 011, Puerto Rico · Built 1944 · 2 Lanes · 17,800 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
18.2977, -67.144697
This bridge is in worse condition than 45.5% of bridges in County 011. The average bridge in Puerto Rico is 0 years old; this one is 82 years old.
Nearby Bridges
PR 833 over DAMIAN CREEK
Built 1945
PR 402 3.1 KM over LARGA CREEK
Built 1991
PR 2 over ABAD CREEK
Built 1996
PR 402 over ABAD CREEK
Built 1996
PR 2 over IRRIGATION DITCH
Built 1960
PR 2 over HONDO CREEK
Built 1960
PR 115 over IRRIGATION CHANNEL
Built 1982
PR 115 1.15 KM over UNKNOWN CREEK
Built 1976
PR 115 0.6 KM over LA PUENTE CHANNEL
Built 1915
PR 430 over ANASCO RIVER
Built 1999
Bridge Details
- Structure #
- 004781
- Year Built
- 1944
- Reconstructed
- 1991
- Length
- 18.5 m (60.7 ft)
- Max Span
- 17.5 m
- Width
- 18.9 m (62 ft)
- Lanes
- 2
- Daily Traffic
- 17,800
- Material
- Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $105,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.