PR 191 9.6 KM over CUBUY RIVER
15 KM N W OF NAGUABO · County 103, Puerto Rico · Built 1937 · 2 Lanes · 1,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.267153, -65.794894
This bridge is in worse condition than 29.6% of bridges in County 103. The average bridge in Puerto Rico is 0 years old; this one is 89 years old.
Nearby Bridges
PR 191 over BLANCO RIVER
Built 1939
PR 191 27.9 KM over BLANCO RIVER
Built 2004
OFF PR 191 over WATERWAY
Built 1975
PR 191 2.1 KM over JOBA CREEK
Built 1939
PR 969 1.2 KM over CREEK
Built 1960
PR 950 6.2 KM over SONADORA CREEK
Built 1960
LOCAL ROAD over WATERWAY
Built 2009
PR 950 8.3 KM over PE¥A POBRE CREEK
Built 1965
PR 948 5.4 KM over GURABO RIVER
Built 1966
PR 186 over GRANDE RIVER
Built 1941
Bridge Details
- Structure #
- 004571
- Year Built
- 1937
- Length
- 21.3 m (69.9 ft)
- Max Span
- 5.8 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $278,000
- Total Project Cost
- $334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.