PR 186 KM 19.9 over SONADORA CREEK

5 KM SOUTH OF RIO GRANDE · County 119, Puerto Rico · Built 1939 · 2 Lanes · 100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
004491
Year Built
1939
Reconstructed
1960
Length
30.4 m (99.7 ft)
Max Span
7.6 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$420,000
Total Project Cost
$631,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.