PR 183 8.1 KM over HATO CREEK

1.5 KM WEST SAN LORENZO · County 129, Puerto Rico · Built 1925 · 2 Lanes · 10,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
004351
Year Built
1925
Reconstructed
1998
Length
10.8 m (35.4 ft)
Max Span
9.7 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
10,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$221,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.