PR 172 13.7 KM over SABANA RIVER
2 KM NORTH EAST OF CIDRA · County 041, Puerto Rico · Built 1944 · 2 Lanes · 20,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
18.176303, -66.151514
This bridge is in worse condition than 81% of bridges in County 041. The average bridge in Puerto Rico is 0 years old; this one is 82 years old.
Nearby Bridges
PR 172 over SABANA RIVER
Built 2011
OFF PR 172 13.3 KM over CIDRA LAKE
Built 2011
ACCESS TO URB. over CIDRA LAKE
Built 2005
OFF PR 172 13.3 KM over CIDRA RESERVOIR DAM
Built 2011
PR 172 15.1 KM over BAYAMON RIVER
Built 1944
PR 171 1.1 KM over EL CABRO CREEK
Built 1950
PR 171 0.7 KM over ARROYATA CREEK
Built 1950
PR 173 11.6 KM over ARROYATA RIVER
Built 1930
PR 787 over BAYAMON RIVER
Built 1918
LOCAL ROAD over RIO ARROYATA
Built 1984
Bridge Details
- Structure #
- 003861
- Year Built
- 1944
- Length
- 37.7 m (123.7 ft)
- Max Span
- 12.6 m
- Width
- 7 m (23 ft)
- Lanes
- 2
- Daily Traffic
- 20,500
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $454,000
- Total Project Cost
- $681,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.