PR 149 over DOÑA JUANA CREEK
8 KM NORTH OF VILLALBA · County 039, Puerto Rico · Built 1923 · 2 Lanes · 700 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.183025, -66.512042
This bridge is in worse condition than 15.8% of bridges in County 039. The average bridge in Puerto Rico is 0 years old; this one is 103 years old.
Nearby Bridges
KM 0.04 over RIO TORO NEGRO
Built 1901
PR 149 over SMALL STREAM
Built 1931
PR 149 over TORO NEGRO RIVER
Built 1924
PR 149 KM 39.95 over CREEK
Built 1926
PR 149 KM 38.8 over RALAT CREEK
Built 1926
PR 143 36.3 KM over MATRULLAS RIVER
Built 1959
PR 149 over CUESTA PASTO CREEK
Built 1921
PR 149 over CINTRON CREEK
Built 1927
OFF PR 157 AT 3.80 over DE CACAOS CREEK
Built 1964
PR 144 over SALIENTE RIVER
Built 1950
Bridge Details
- Structure #
- 003151
- Year Built
- 1923
- Length
- 14.6 m (47.9 ft)
- Max Span
- 7.4 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 2
- Daily Traffic
- 700
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $177,000
- Total Project Cost
- $213,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.