PR 139 23.4 KM over DEPRESSION

1.2 KM S INT PR 143 & · County 113, Puerto Rico · Built 1940 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
002841
Year Built
1940
Length
23.7 m (77.8 ft)
Max Span
8.2 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
1,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$512,000
Total Project Cost
$614,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.