PR 111R 2.1 KM over MATADERO CREEK

1 KM EAST OF UTUADO · County 141, Puerto Rico · Built 1925 · 2 Lanes · 28,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
002411
Year Built
1925
Length
8.7 m (28.5 ft)
Max Span
8.7 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
28,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$187,000
Total Project Cost
$281,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.