PR 123 32 KM over SALTILLO CREEK

2.3 KM S E OF ADJUNTAS · County 001, Puerto Rico · Built 1901 · 2 Lanes · 3,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
001481
Year Built
1901
Length
9.1 m (29.9 ft)
Max Span
7.4 m
Width
16.4 m (53.8 ft)
Lanes
2
Daily Traffic
3,100
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$146,000
Total Project Cost
$182,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.