PR 103 12 KM over BOQUERON CREEK
6 KM SOUTH OF CABO ROJO · County 023, Puerto Rico · Built 1933 · 2 Lanes · 8,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.035719, -67.141311
This bridge is in worse condition than 68.2% of bridges in County 023. The average bridge in Puerto Rico is 0 years old; this one is 93 years old.
Nearby Bridges
CONNECTOR ROAD 0.2 over DIRT ROAD
Built 2002
PR 101 over CREEK
Built 1992
PR 301 1.25 KM over WATERWAY
Built 1982
PR 101 12.8 KM over LOS LLANOS CREEK
Built 1972
PR 301 over WATERWAY
Built 1981
PR 301 2.15 KM over WATERWAY
Built 1981
PR 3306 0.8 KM over PARIS CREEK
Built 1958
PR 307 over BOQUERON RIVER
Built 1950
PR 103 over LAS TUNAS CREEK
Built 1983
PR 102 over PIEDRA CREEK
Built 1993
Bridge Details
- Structure #
- 001411
- Year Built
- 1933
- Length
- 8.2 m (26.9 ft)
- Max Span
- 7 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 8,300
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $243,000
- Total Project Cost
- $304,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.