PR 955 over JUAN GONZALEZ CREEK
4 KM EAST OF RIO GRANDE · County 119, Puerto Rico · Built 1900 · 2 Lanes · 1,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
18.374933, -65.800675
This bridge is in worse condition than 85.4% of bridges in County 119. The average bridge in Puerto Rico is 0 years old; this one is 126 years old.
Nearby Bridges
PR 3 over JUAN GONZALEZ CREEK
Built 1976
RURAL LOCAL ROAD over CULEBRA CREEK
Built 2005
PR 3 over DIRT ROAD
Built 1978
OFF PR 3 over UNNAMED CREEK
Built 1995
PR 3 over ESPIRITU SANTO RIVER
Built 1976
PR 966 0.8 KM over ESPIRITU SANTO RIVER
Built 1993
PR 3 30.7 KM over CATTLE PASS
Built 1978
LOCAL ROAD over DEPRESSION
Built 1956
PR 3 25.5 KM over GRANDE RIVER
Built 1976
PR 187 KM 29.9 over La Vega Creek
Built 1940
Bridge Details
- Structure #
- 001051
- Year Built
- 1900
- Length
- 11.8 m (38.7 ft)
- Max Span
- 9.6 m
- Width
- 5.6 m (18.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $143,000
- Total Project Cost
- $171,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.