PR 114 3.7 KM over ABANDONED RAILROAD

2 KM WEST OF HORMIGUEROS · County 067, Puerto Rico · Built 1939 · 2 Lanes · 9,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000701
Year Built
1939
Length
7.9 m (25.9 ft)
Max Span
7 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
9,800
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$93,000
Total Project Cost
$116,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.