SR 3009 over Branch of Buffalo Creek

EAST FINLEY TOWNSHIP · County 125, Pennsylvania · Built 2022 · 2 Lanes · 242 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
000000000069515
Year Built
2022
Length
7 m (23 ft)
Max Span
6.1 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
242
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.