T-402 (CO. BR.#21) over SOUTH BRANCH TOWANDA CR

2.6 MI. S. OF MONROETON · County 015, Pennsylvania · Built 2022 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
000000000069231
Year Built
2022
Length
47.5 m (155.8 ft)
Max Span
23.2 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.