RAMP B S.B. OFF over ARAMINGO AVE (NB) SPUR A

GIRARD AVE.INTERC.3591A05 · County 101, Pennsylvania · Built 2020 · 1 Lanes · 12,240 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000057490
Year Built
2020
Length
238.4 m (782.2 ft)
Max Span
40.8 m
Width
15.2 m (49.9 ft)
Lanes
1
Daily Traffic
12,240
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.