CONCHESTER HIGHWAY over SMITH BRIDGE ROAD

2MI.S.E.CONCORDV. 41F01 · County 045, Pennsylvania · Built 2020 · 2 Lanes · 27,674 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
000000000057459
Year Built
2020
Length
27.4 m (89.9 ft)
Max Span
27.4 m
Width
25.6 m (84 ft)
Lanes
2
Daily Traffic
27,674
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.