Hickory Grade Rd over SR 576(Southern Beltway)

MP 17.97 on Rt. 576 · County 003, Pennsylvania · Built 2019 · 2 Lanes · 250 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000057205
Year Built
2019
Length
105.8 m (347.1 ft)
Max Span
59.1 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
250
Material
Other
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.